Wireless gas detection on a nuclear project site

GM700 wireless series

Wireless fixed detectors deployed where cable routing was not possible during construction of a nuclear project.

The setting

Construction areas on a nuclear site change weekly. Detection points that would normally be cabled in have to move with the work front, and pulling permanent cable to a temporary location is not practical.

Why it is difficult

Temporary cable runs in a classified and access-controlled area carry their own approval burden, and a detector that cannot be relocated is a detector that gets bypassed.

What was deployed

Wireless fixed detectors with local alarm and a gateway back to the site monitoring station, positioned to follow the active work front rather than fixed to a plant layout.

Outcome

Detection coverage moved with the construction sequence instead of lagging behind it. Radio range and battery endurance figures to be supplied by the factory.